Normally our production circle is from 30-50working days depending on the order.
For the time being, from the day we get your deposit to the delivery we are looking at 90-150 days at your door delivery. Our leadtime will vary depending on our factory workload but we do like to keep honest leadtimes so there is no surprises except getting the equipment earlier that what it was suppose to.
es, we support product customization.
We are a factory, so you can tell our sales manager about the product requirements, and our engineers will design your own drawings for you.
Let’s take a common designed 10BBL beer equipment system as example,the list of the brewing system as below:
10BBL Mash/lauter tun
10BBL Kettle/Whirlpool tun steam heated
20BBL Hot water tank
3m3 wort pump and hot water pump
Stainless steel 304 wort pipes
10m2 plate heat exchanger
Operation platform
4 pieces 10BBL fermentation tanks
Glycol water tank
Chiller
Cooling pipes and valves
CIP unit
Control cabinet with semi automatic control system
This complete 10BBL beer equipment cost is around 75,000$-200,000$,there also also some factors affect the 10BBL beer equipment cost such as the valves and pipes which need to be designed as per your brewing requirements and brewery site floor plan,the steam boiler price and other special requirements from you.
The 10bbl brewhouse combination type.There are 10BBL 2-vessel brewhouse,10BBL 3-vessel brewhouse,10BBL 4-vessel brewhouse,10BBL 5-vessel brewhouse…each type of the brewhouse price has big difference
The 10bbl fermenter quantity you need.As we all the know,the more you need,the more you need to pay.If you don’t have enough money to buy the full quantity of the fermenters,we suggest you buy a couple of them at the first stage,when your brewery growing up,you can add them in the future.